
In execution
Foltești & Tulucești Wind Farm
Galați County, Romania
Project capacity130.5 MW
Project overview
Foundation work at site scale.
A 29-position Goldwind GW155 project currently in execution.
The project profile brings together the essential execution status, turbine system and capacity information in a clear technical overview.
- Project status
- In execution
- WTG
- 29
- Manufacturer
- Goldwind
- Turbine model
- GW155
- MW / unit
- 4.5 MW
- Total project capacity
- 130.5 MW
- Client
- Helios Energy
- Final client
- Alerion Energy
Site photography
The structure taking shape.
Construction views show the foundation geometry, reinforcement and on-site execution stages.


WTG / SYSTEMGoldwind
Goldwind
GW155
- Rated unit value
- 4.5 MW
- Positions listed
- 29
Manufacturer and model are reproduced exactly from the project table. No manufacturer endorsement is implied.

